The
Lions retained JBC to assist in the design of a new, state-of-the-art practice
facility in Allen Park. Designed to be environmentally sensitive, the 235,000
square feet of new field turf will implement numerous new technologies.
The athletic surfaces will be maintained using a best management practice fertility
program developed by JBC for local site constraints. Subsurface drainage monitoring
will minimize the impact of the facility upon adjacent wetlands. Automated field
sensors will monitor temperature, volumetric water, and gas levels in the soil,
thereby providing a detailed understanding of field agronomy.
The new fields will include nearly five acres of sand-based turf, providing
the Lions with two full-sized football fields and a dedicated sled training
area. The facility is scheduled to open in 2002.
Detroit
Lions Training and Practice Facility (NFL)
Allen
Park, Michigan